Afghanistan

The Hairatan–Termez route: rail bridge, Uzbek transit, documents and timelines

The Hairatan–Termez route crosses the Amu Darya on the Friendship Bridge, a road and rail bridge opened in 1982 and the only fixed link between Uzbekistan and Afghanistan. In 2026 it is the main gateway for cargo from China and Central Asia into Afghanistan: containers come by rail through Kazakhstan and Uzbekistan, cross at Termez and continue on the 75 km line to Mazar-i-Sharif or by truck. Plan for Uzbek transit paperwork, Afghan customs in ASYCUDA and a compliance check before booking.

7 min readUpdated: Golden Way · Dubai · Guangzhou

Key points

  • The Friendship Bridge carries both road and rail and is the only fixed Uzbekistan–Afghanistan link.
  • The 75 km Hairatan–Mazar-i-Sharif railway is run by a subsidiary of Uzbekistan Railways.
  • Rail from Chongqing to Hairatan is reported at about 12–15 days; door to door to Kabul is typically 30–45 days with us.
  • Cargo crosses Kazakhstan under EAEU transit and Uzbekistan under Uzbek transit procedures or TIR.
  • The route avoids Iran and Pakistan, but every Afghanistan shipment still needs sanctions screening.

What the Hairatan–Termez crossing is

Termez is the southernmost city of Uzbekistan; Hairatan is the Afghan border town on the other bank of the Amu Darya. The Friendship Bridge between them, about 816 m long, opened on 12 May 1982 and carries both a road and a railway. A short rail link of about 10 km joins the Hairatan terminal to Termez. In 2010 an Asian Development Bank-financed line, built for about USD 129 million, extended the railway 75 km to Mazar-i-Sharif. Sogdiana Trans, a subsidiary of Uzbekistan Railways, has operated it since then; the agreement was extended in January 2025. In 2024 the line carried 4,200 containers of China–Afghanistan trade, and in May 2026 a new cargo terminal opened on it, with a 1.65 km branch near Naibabad station proposed to cut wagon waiting times.

816 mlength of the Friendship Bridge
75 kmHairatan–Mazar-i-Sharif railway
4,200China–Afghanistan containers on the line in 2024
4.2mtonnes on Afghanistan's northern rail routes, year to March 2026
Xi'anKhorgosSaryagashTermezHairatanNaibabad
Rail
SegmentModeWho runs itWhat to know
China to Khorgos or AlashankouRailChina RailwayStandard gauge; change to 1,520 mm broad gauge at the border takes about 1–3 days
Across KazakhstanRailKazakhstan Temir ZholyEAEU customs transit; no duty paid in Kazakhstan
Saryagash to TermezRailUzbekistan RailwaysUzbek customs transit to the border
Termez to HairatanRail and roadUzbek and Afghan border customsFriendship Bridge; the only fixed crossing
Hairatan to Naibabad (Mazar-i-Sharif)RailSogdiana Trans (Uzbekistan Railways)75 km; new cargo terminal opened May 2026
Mazar-i-Sharif to Kabul and other citiesTruckAfghan carriersSalang highway; snow closures in winter

Uzbekistan transit: how cargo reaches Termez

Uzbekistan is not a member of the Eurasian Economic Union; it is an observer. So rail cargo from China crosses Kazakhstan under EAEU customs transit and then enters Uzbekistan at Saryagash under Uzbek transit procedures, without being cleared for the Uzbek market. Trucks can also come from Kashgar over the Irkeshtam pass to Osh in Kyrgyzstan, then through the Fergana Valley into Uzbekistan. In 2022 a rail-road service Kashgar–Osh–Andijan–Hairatan took about 9 days. China, the five Central Asian states and Afghanistan are all parties to the TIR Convention, but TIR operations into Afghanistan are not confirmed as available today, so road cargo is often handed over or reloaded at the border.

  • China rail hub to Hairatan or Naibabad in one waybill
  • Reported 12–15 days Chongqing to Hairatan
  • Best for full containers, bulk and heavy goods
  • One gauge change, at the China–Kazakhstan border

Documents for the Hairatan route

Paperwork to prepare before loading

0/9

Timeline: from loading in China to release at Hairatan

  1. Compliance check and bookingWe screen the parties and goods, then book rail or truck space.
  2. Loading in ChinaCargo is loaded at a rail hub such as Chongqing or Xi'an, or picked up by truck, and declared for export.
  3. Gauge change at the borderAt Khorgos or Alashankou containers move to broad-gauge wagons, usually within 1–3 days.
  4. Transit through KazakhstanThe train runs under EAEU transit towards Saryagash.
  5. Transit through UzbekistanUzbek customs supervises the cargo to Termez.
  6. Crossing the Friendship BridgeThe train or truck crosses to Hairatan and the cargo is declared to Afghan customs.
  7. Clearance or bonded moveGoods are cleared at Hairatan or move under bond to Mazar-i-Sharif or Kabul customs.
  8. Inland deliveryRail to Naibabad and trucks onward deliver to the consignee.

Rail from Chongqing to Hairatan is reported at about 12–15 days. Our published China to Afghanistan service runs at typically 30–45 days door to door, which includes pickup, export, transit, Afghan customs and inland trucking. What adds time: the September–January peak, queues at gauge-change yards, Irkeshtam closures on weekends and holidays, snow on the Salang highway, valuation checks and inspections.

Total volume–
Total weight–
Sea LCL charged (W/M)–
Road charged (1 CBM = 333 kg)–
Best fit–

Usable space: 20GP ~25–28 CBM, 40GP ~55–58, 40HQ ~65–68.

Afghan customs at Hairatan

Hairatan is one of the main Afghan customs offices running ASYCUDA World. A licensed Afghan broker files the declaration; some goods are cleared at the border, others move under bond to inland customs at Mazar-i-Sharif or Kabul. Expect document checks, valuation against reference values and physical inspection, plus ANSA checks for goods under mandatory standards. You pay customs duty under the national tariff, a fixed tax reported at about 2% (licensed importers) or 3% (unlicensed) of the value including duties, and fees. Hairatan mainly handles imports such as oil, liquefied gas, wheat and cement; Afghan figures for the year to March 2026 put exports plus transit at under 2% of rail traffic.

Compliance on the northern route

Using Uzbekistan avoids Iranian ports and the closed Pakistan crossings, but the Afghanistan rules do not change. UN Resolution 1988 freezes the assets of listed Taliban-associated persons and entities and bans arms supplies to them, so we screen consignees, end users, banks and agents against the UN, OFAC, EU and UK lists. Transit countries apply their own controls too: in April 2026 the EU listed entities in Kazakhstan and Uzbekistan in a sanctions package aimed at Russia. Dual-use goods such as drones, communications equipment and night-vision devices go to our compliance team, and payment must come through approved banking channels, never hawala.

Tap a card to flip it

Hairatan–Termez quick check

What does the Friendship Bridge carry?
Where does cargo from China change rail gauge on this route?
Does a route through Uzbekistan remove the need for sanctions screening?

Frequently asked questions

What is the Hairatan–Termez route?

It is the crossing between Termez in Uzbekistan and Hairatan in Afghanistan over the Friendship Bridge on the Amu Darya, used by both trains and trucks. It is the main gateway for Chinese and Central Asian cargo into Afghanistan in 2026.

How long does rail take from China to Hairatan?

The China–Afghanistan container service is reported at about 12–15 days from Chongqing to Hairatan. Door to door to Kabul is typically 30–45 days with us, including customs and trucking.

Does the railway go beyond Hairatan?

Yes, 75 km to the Naibabad area near Mazar-i-Sharif. There is no railway to Kabul yet; the Trans-Afghan Railway is still in development, so the last leg is by truck.

Do I pay customs duty in Uzbekistan for goods going to Afghanistan?

Not if the goods move under transit. They cross Kazakhstan under EAEU transit and Uzbekistan under Uzbek transit procedures, and duty is paid in Afghanistan.

What documents are needed at Hairatan?

Commercial invoice, packing list, SMGS waybill or CMR, transit declaration or TIR carnet, certificate of origin, the importer's business licence and TIN, and permits or ANSA certificates for regulated goods.

Is the Hairatan route open in November 2026?

Yes, it is the main working route at last check. Border routines can change at short notice, so we confirm the live status for every booking.

Was this article useful?

Sources

  1. Wikipedia: Afghanistan–Uzbekistan Friendship Bridge
  2. Wikipedia: Hairatan (Hairatan–Mazar-i-Sharif railway, Termez rail link)
  3. Advantour: Friendship Bridge, Termez (bridge length)
  4. Times of Central Asia: Uzbekistan extends agreement on Hairatan–Mazar-i-Sharif railway (27 January 2025)
  5. Times of Central Asia: New cargo terminal opens on Hairatan–Mazar-i-Sharif railway (25 May 2026)
  6. RailTarget: Afghanistan rail freight growth across border corridors (22 April 2026)
  7. Kazakhstan Temir Zholy: First railway route China–Afghanistan has been organized
  8. Eurasianet: Cargo leaves China for Afghanistan on new route via Kyrgyzstan, Uzbekistan (2022)
  9. Customs Committee of the Republic of Uzbekistan
  10. UN Security Council: 1988 Sanctions Committee

General information checked on the date shown. Rules and rates change: our team confirms the details for your shipment.

Keep reading

AfghanistanShipping from China to Kabul: routes, timelines and compliance in 2026How to ship from China to Kabul in 2026: rail and road via Uzbekistan and Hairatan, Iran and Pakistan route status, documents, Afghan duties and compliance.8 min readAfghanistanShipping from Dubai to Afghanistan in 2026: routes, compliance and paymentsShipping from Dubai to Afghanistan in 2026: Iran and Pakistan route status, northern alternatives, UAE transit rules, compliance screening and banking limits.8 min readRussiaShipping from China to Russia: routes, customs, marking and compliance in 2026China to Russia shipping in 2026: rail via Kazakhstan or the Far East, 22% VAT, EAC and Chestny ZNAK marking, payment problems and sanctions screening.8 min readTurkey and EuropeChina Europe rail freight: routes, transit times and when rail beats sea (2026)China Europe rail freight in 2026: northern and Middle Corridor routes, gauge changes at Dostyk and Brest, 12–22 day transit, when rail beats sea, cost drivers.8 min readTurkey and EuropeThe Middle Corridor route: how the Trans-Caspian corridor works in 2026The Middle Corridor route in 2026: Kazakhstan, Caspian ferry, Azerbaijan, Georgia and Turkey. Transit times, capacity, bottlenecks, pros and cons for shippers.8 min readShipping basicsTIR carnet explained: the transit passport for road freightWhat a TIR carnet is, how sealed trucks cross borders without paying duty at each one, which countries use it in 2026, what it costs and the alternatives.9 min read