Key points
- Alashankou (Xinjiang) and Dostyk (Kazakhstan) face each other across the border; the cross-border rail link opened in 1990.
- Alashankou ranked first among China's rail border ports in January–July 2026 with 4,341 trains and 455,325 TEU.
- Dostyk carries more tonnage than Altynkol, but much of it is Kazakh exports to China, not containers.
- Every container is moved between gauges here; a block train moves fast, single boxes wait for a full train.
- Second tracks on the 836 km Dostyk–Moyynty line raised planned capacity from 12 to 60 pairs of trains a day.
Where Alashankou and Dostyk sit on the map
Alashankou is a border port in north-western Xinjiang, at the end of the Northern Xinjiang railway from Urumqi. Across the line is Dostyk, a Kazakh station in the Jetisu Region on the Aktogay–Dostyk branch of the Turkestan–Siberia Railway. The station opened in 1954 as Druzhba and was renamed Dostyk in 2007; both names mean friendship. The rail link across the border opened in 1990, which makes this the older of Kazakhstan's two rail gateways to China.
- 1Urumqi
- 2Alashankou
- 3Dostyk
- 4Aktogay
- 5Moyynty
From Aktogay trains go north toward Russia and Europe, south toward Almaty and Uzbekistan, or west along the Dostyk–Moyynty line into central Kazakhstan. That spread of exits is why so many China–Europe services use this crossing.
What crosses Alashankou–Dostyk in 2026
On the Chinese side, Alashankou is the leading port for China–Europe and China–Central Asia trains. In January–July 2026 it handled 4,341 trains and 455,325 TEU, first among China's six rail border ports, and together with Manzhouli more than 60% of the total. China News Service reported 130 routes through Alashankou reaching 21 countries, with more than 200 types of cargo. The 7,000th train of 2026 passed on 12 October, 45 days earlier than in 2025.
On the Kazakh side the picture is different, because Dostyk also carries bulk exports to China. In January–October 2026 Kazakhstan's Ministry of Transport counted 5.0 million tonnes from China into Kazakhstan through Dostyk (up 13%) and 13.1 million tonnes from Kazakhstan to China (up 12%). Kazakhstan's exports to China by rail are mainly iron ore, animal feed, metals, grain, crude oil and oil products, which is why Dostyk's eastbound tonnage is so much larger than its westbound.
| Direction through Dostyk | Jan–Oct 2026 | Change on 2025 |
|---|---|---|
| China to Kazakhstan | 5.0 million tonnes | +13% |
| Kazakhstan to China | 13.1 million tonnes | +12% |
| Altynkol, both directions, for comparison | 13.7 million tonnes | +1% to +6% by direction |
The gauge change at Dostyk: what happens to a container
Chinese track is 1,435 mm, Kazakh track 1,520 mm, so a break of gauge is required at the station. Containers are lifted from Chinese flat wagons onto Kazakh ones and a new train is formed. Bulk cargo such as grain or ore has to be transloaded between wagons, which is slower than lifting a sealed box.
The container side has been expanded. The Dostyk TransTerminal, owned by PTC Holding, opened its first stage in June 2021 and doubled to 320,000 TEU a year in 2022, with further phases planned toward 700,000 TEU. It has storage space where containers wait until enough are gathered to form a block train, which tells you where the time goes for single containers.
Alashankou–Dostyk or Khorgos–Altynkol
- Older crossing, opened 1990
- Largest tonnage, including heavy Kazakh exports to China
- Strong link north and west via Aktogay and Dostyk–Moyynty
- Main gateway for many China–Europe trains
- Newer crossing next to the Khorgos dry port and ICBC
- More direct to Almaty and the south of Kazakhstan
- Larger China-to-Kazakhstan tonnage in Jan–Oct 2026 (7.1 mt)
- Has a parallel road crossing at Nurzhol for trucks
Shippers rarely choose between the two: the rail operator routes the train. If your cargo is for Almaty or Uzbekistan and arrives on a Khorgos train, that is normal. If it is for northern Kazakhstan or for transit further west, Dostyk is the more common path.
Where the days are lost at Dostyk
Peak season. Roughly September to January, westbound container volume and eastbound grain and ore exports peak together. The record pace of 2026 means that the yard is busy earlier in the year than it used to be.
Waiting for a full train. A container on a mixed train sits in the terminal until enough boxes for the same direction are gathered. Booking onto a block train that is already full from origin avoids this.
Wagon supply. The broad-gauge flats have to come back from Kazakhstan, Russia and Uzbekistan. When they are slow to return, containers wait for wagons even when the yard has space.
Documents. A waybill that does not match the invoice or the seal number, or missing advance information for Kazakh customs, stops a container while the rest of the train moves on. This is the one cause the shipper fully controls.
Line capacity behind the border has improved. KTZ opened second tracks on the 836 km Dostyk–Moyynty line in stages through 2025, the last section on 30 September 2025, and said capacity would rise from 12 to 60 pairs of trains a day. In early October 2025 the new tracks were carrying about 20 trains a day each.
Planning a shipment through Alashankou–Dostyk
Before your container reaches Alashankou
0/7Golden Way ships from China to Central Asia by rail and road via Khorgos, and we route through Dostyk when the train or the destination calls for it. Our team quotes the route and the current transit estimate within one working day.
Frequently asked questions
Is there a road crossing at Alashankou–Dostyk as well?
Yes, there is a road crossing next to the rail station, but for trucks most China–Kazakhstan traffic uses Khorgos–Nurzhol and the other road posts. Alashankou–Dostyk is known mainly as a rail gateway.
Does the gauge change mean the goods are unloaded from the container?
No. For containerised cargo the whole sealed container is lifted from one wagon to another. Only bulk and some conventional wagon cargo is transloaded.
Will the new Bakhty–Ayagoz line take traffic away from Dostyk?
It is meant to add a third crossing; Kazakh officials target 2027 for completion. Until it opens, all China–Kazakhstan rail freight uses Dostyk or Altynkol.
Are containers inspected at Dostyk?
Kazakh customs applies risk management. Most containers in transit or with complete documents pass on paperwork and scanning; a document mismatch or a risk signal can lead to a physical inspection.
How long does a container from Xi'an take to cross the border here?
In normal conditions allow 1–3 days for the gauge change and formalities at the border. The full trip to Almaty is typically about 7–14 days from eastern and central China.
Sources
- The Astana Times: Kazakhstan–China rail freight rises 9% to 18.7 million tons in first half of 2026 (16 Jul 2026)
- Trend: Kazakhstan–China rail freight transportation rises 8% in January–October (15 Nov 2026)
- China News Service: Alashankou passes 7,000 China–Europe (Central Asia) trains this year (13 Oct 2026)
- Seetao: Alashankou leads China–Europe train border ports, January–July 2026 (18 Aug 2026)
- Kazakhstan Temir Zholy: The capacity of the railway to China will increase fivefold (26 May 2025)
- Kazakhstan Temir Zholy: The second tracks of the Dostyk–Moiynty section are in operation (6 Oct 2025)
- Railway Gazette: Transhipment capacity doubles at Kazakh border rail terminal
- Wikipedia: Dostyk railway station