Vessel Demurrage vs Container Demurrage: Which One Are You Facing?

If your goods travel in containers on a scheduled line, the demurrage on your invoice is container demurrage: a daily charge per box after the line's free time. Vessel demurrage only exists when someone has chartered a ship and the loading or discharging took longer than the laytime agreed in the charter party. The two follow different contracts, different clocks and different ways of arguing the bill.

6 min readUpdated: Golden Way · Dubai · Guangzhou

Key points

  • Container demurrage is set by the shipping line's tariff and charged per container per day after free time.
  • Vessel demurrage is an agreed daily amount for the whole ship, payable once laytime under a charter party has expired.
  • Laytime starts from a valid notice of readiness and is shaped by terms such as SHEX, weather working days and WIBON.
  • Once a ship is on demurrage it usually stays on demurrage, even through periods that would not have counted as laytime.
  • Charter parties often carry short document time bars; a valid claim can be lost on paperwork alone.
  • Arises under a liner B/L and the line's published tariff
  • Unit: one container, per day
  • Clock: after free time, from discharge until the full box leaves the terminal (import)
  • Payer: usually the consignee at destination
  • Typical cargo: anything in 20ft or 40ft boxes, FCL or LCL

Three questions that tell you which demurrage is on your invoice

  • Did anyone sign a charter party or a fixture recap for this cargo? If not, it is container demurrage.
  • Is the rate per container, or per day for the vessel? A per-box rate with day tiers is a liner tariff.
  • Is there a laytime statement attached, listing the notice of readiness, start and stop times and exceptions? That is vessel demurrage.

Most importers of finished goods from China only ever see container demurrage. Vessel demurrage reaches buyers of bulk commodities, project cargo and full shiploads, often indirectly: the seller chartered the ship, and the sale contract passes the discharge-port demurrage on to the buyer.

How laytime turns into vessel demurrage

BIMCO's Laytime Definitions describe laytime as the period agreed between the parties during which the owner makes and keeps the vessel available for loading or discharging, and demurrage as an agreed amount payable to the owner for delay once laytime has expired. Despatch is the reverse: an amount the owner pays if the work finishes early, where the charter provides for it.

  1. Vessel arrives and tenders notice of readinessThe ship must have reached the agreed place and be physically and legally ready. A notice tendered before the ship was ready can be invalid, which delays the start of laytime.
  2. Turn time passesMany charters give a few hours after notice of readiness before laytime starts, unless work begins sooner.
  3. Laytime runs, minus the exceptionsSundays and holidays excepted (SHEX), weather working days and named events such as strikes stop or reduce the count, but only as the contract wording allows.
  4. Waiting for a berthWith 'whether in berth or not' (WIBON) the ship can give notice from the usual waiting place, so congestion time counts against the charterer.
  5. Loading and discharge time combined or kept apartReversible laytime pools both ends; averaged laytime calculates them separately and offsets time saved against time used.
  6. Laytime expires: demurrage startsFrom now the agreed daily amount runs, and in general it keeps running through weekends and rain until the work is done.
  7. Laytime statement and claimThe owner sends a statement with the notice, the statement of facts and time sheets. Check every interruption and every exception against the clause.

Example (hypothetical): a charter allows three weather working days, Sundays and holidays excepted, to discharge a steel cargo. The ship gives a valid notice on Thursday morning, rain stops work for half a day, and Friday is a public holiday. The statement should exclude the rain and the holiday from laytime. If discharge still takes a day and a half beyond the allowance, that day and a half is on demurrage, and a second holiday falling within it would usually count against the charterer.

Container demurrage under a liner tariff: the per-box clock

In liner shipping there is no laytime. The line gives free time per container, commonly somewhere between 3 and 14 days depending on the carrier, port, contract and equipment, then charges per box per day, usually in rising tiers. The terminal may charge storage on top. In 2026, rerouting of UAE cargo away from Hormuz has also changed which port's tariff applies and where empties go back, so read the release, not last year's tariff.

Days over free time–
Estimated charge–

Free time and daily charges differ by line, port and container type. Use the figures on your booking.

Choose a charter if you can control the berth; stay in containers if you cannot

Choose a voyage charter if the volume fills or nearly fills a ship, the cargo suits bulk or breakbulk handling, and your receiver can guarantee a berth, cranes, trucks and documents at discharge. You then carry the laytime risk, and you can also earn despatch if you work fast.

Stay with containers if volumes are smaller, the goods are packaged, or the discharge side is uncertain. Your exposure is per box and limited to the boxes that are late. That matters at congested ports: a delay that costs a few containers some days of demurrage could cost a chartered ship many days on full demurrage.

Which one applies to you?

You import two 40HQ of furniture from Foshan on a carrier B/L. The arrival notice warns of charges after 7 days. What is it?
Your supplier sells 20,000 t of rebar CFR and its contract says the buyer pays demurrage at discharge per the charter party. What is that?
The ship anchored three days waiting for a berth under a WIBON charter. Does that time count?

Trade-offs nobody mentions until the claim arrives

  • Short time bars: many charter parties require the demurrage claim with supporting documents (notice of readiness, statement of facts, time sheets) within a fixed number of days, or it is lost.
  • B/L holders can be caught: if the bill incorporates the charter terms, a receiver who never signed the charter may face the owner's demurrage claim.
  • Despatch is not automatic: if the charter does not provide for it, finishing early earns nothing.
  • In liner shipping, port storage, detention and demurrage are separate lines; a combined free-time offer may be cheaper even with fewer days.
  • Rerouted Gulf cargo: as of autumn 2026, discharge at Khor Fakkan, Sohar or Jeddah changes which terminal tariff and empty-return depot applies.

Frequently asked questions

Is demurrage a penalty?

Under a charter party it is treated as liquidated damages: an agreed amount for delay, so the owner does not need to prove actual loss. Container demurrage under a liner tariff is a contractual charge for keeping the box beyond free time.

What is despatch money?

An amount the shipowner pays the charterer for finishing loading or discharging before laytime expires, where the charter provides for it. The rate is agreed in the fixture alongside the demurrage rate.

What does SHINC mean on a charter party?

Sundays and holidays included: those days count as laytime. SHEX means they are excepted. The wording, and the local holiday calendar, can change the result by days.

Can container demurrage be waived?

Sometimes, for example when the delay was caused by the carrier or by a port closure, but it is a commercial decision by the line. Ask in writing with evidence before you pay, and keep the dates of every event.

Is detention the same as vessel detention?

No. Container detention is the charge for keeping the line's box outside the terminal. Under a charter party, 'damages for detention' are what an owner may claim beyond any fixed demurrage period, and they depend on the contract.

Does Golden Way charter ships?

Our services are container and land transport: FCL and LCL sea freight, trucking and clearance. For full ship charters we can explain the terms, but the charter itself is negotiated with a shipbroker.

Was this article useful?

Sources

  1. BIMCO, CMI, FONASBA, INTERCARGO: Laytime Definitions for Charter Parties 2013
  2. The Shipowners' Club: Laytime and demurrage
  3. Tradlinx: Maersk's Gulf rerouting changes port of discharge, D&D and empty returns (Sep 2026)
  4. Lloyd's List Intelligence: Strait of Hormuz Brief, 22 October 2026

General information checked on the date shown. Rules and rates change: our team confirms the details for your shipment.

Keep reading

Shipping basicsShipping lithium batteries from China: UN numbers, documents and Gulf rules for 2026Ship lithium batteries from China in 2026: the right UN number, UN38.3, SDS, DG declaration, sea vs road vs air rules and the Gulf approvals you will need.8 min readShipping basicsTIR carnet explained: the transit passport for road freightWhat a TIR carnet is, how sealed trucks cross borders without paying duty at each one, which countries use it in 2026, what it costs and the alternatives.9 min readShipping basicsIncoterms 2020 explained: the 11 rules, who pays and where risk passesIncoterms 2020 explained for importers buying from China: all 11 rules, who pays each cost, where risk passes, and the container traps to avoid in 2026.9 min readShipping basicsFOB vs CIF: which is better when you import from China to the Gulf?FOB vs CIF for importers in the UAE and Gulf: who pays freight and destination charges, where risk passes, the CIF insurance gap, and a worked duty example.7 min readShipping basicsEXW vs FOB: the China export clearance problem, and when FOB is saferEXW vs FOB for buyers in China: why EXW leaves you an export clearance you cannot file, how the VAT rebate affects price, and when FOB or FCA is the safer term.7 min readShipping basicsDDP vs DAP: who pays duty and VAT, and which term works for Gulf importsDDP vs DAP explained for Gulf importers: who pays duty and VAT, who is importer of record, why DDP often fails in the UAE and Saudi Arabia, and when to use each.8 min read