Get a quote
Lebanon and Syria

Latakia and Tartus: A Field Guide to Syria's Two Ports

If your cargo is in a container, it almost certainly enters Syria through Latakia, where CMA CGM's terminal handles about 95% of the country's containerised trade. Tartus, further south on the same coast and run by DP World since November 2025, is the port for general cargo, breakbulk and ro-ro, and is being rebuilt to take more containers. Both were working normally in mid-2026 and, because they face the Mediterranean, were barely touched by the Hormuz closure.

7 min readUpdated: Golden Way · Dubai · Guangzhou

Key points

  • Latakia: CMA CGM container terminal, 30-year agreement signed 1 May 2025, about 95% of Syria's container trade
  • Tartus: DP World 30-year concession, handover in November 2025, $800 million modernisation plan
  • Europe to Syria by sea was active in May 2026 with an indicative 3–4 week lead time
  • Freight trains run again from Latakia to the Adra dry port near Damascus
  • Syria's new customs law and harmonised tariff apply from 1 June 2026
  • Container terminal operated by CMA CGM since 2009, renewed for 30 years on 1 May 2025
  • About 95% of Syria's containerised imports and exports
  • Around 120,000 containers and over 2 million tonnes handled in 2026 up to early July
  • Rail link to the Adra dry port near Damascus restored

Latakia container terminal: what CMA CGM runs and plans

CMA CGM first won a contract for the Latakia container terminal in 2009. After the change of government it signed a new 30-year agreement on 1 May 2025, and in August 2025 it brought forward the second phase of investment. The group describes a €30 million first phase followed by a €200 million commitment to take the terminal beyond 1 million TEU a year, modernise and digitise operations, upgrade the infrastructure for ships drawing 16 metres, and build rail and road links and dry ports inland.

Enab Baladi, reporting in July 2026, gave more detail: a total of €230 million over the concession, a planned new quay of about 1.5 km with 17 metres of water, and a revenue split of 60% to the Syrian state and 40% to the company. Up to 5 July 2026 the port had handled more than 2 million tonnes of cargo and about 120,000 containers. During the French president's visit to Damascus that month, CMA CGM announced further projects: dry ports in Damascus and Aleppo, a logistics zone at the Nasib border crossing, air freight facilities at Damascus airport and railway rehabilitation.

95%share of Syria's container trade through CMA CGM's Latakia terminal
1 million+ TEULatakia target capacity after phase 2
$800 millionDP World's planned investment in Tartus
3–4 weeksindicative Europe to Syria sea lead time, May 2026

Tartus under DP World: general cargo first, containers next

Tartus is Syria's second-largest seaport. DP World signed a 30-year concession for it in July 2025 and took over operations after a formal handover from the General Authority for Land and Sea Ports in November 2025, naming Fahad Al Banna, previously a senior container operations manager at Jebel Ali, as chief executive. Its first moves were practical: a new harbour tug, an assessment of the infrastructure, and dredging of the access channels, basins and berths.

The medium-term plan covers new container and non-container facilities, bulk handling systems, more storage and digital platforms. In May 2026 DP World said it was speeding up the $800 million programme across containers, general cargo, breakbulk and ro-ro. For now, think of Tartus as the natural choice for steel, project cargo, bagged goods and vehicles under the rules that allow them, and check with the carrier before routing a container there instead of Latakia.

How cargo reaches Latakia and Tartus from Europe, Asia and the Gulf

The Logistics Cluster's May 2026 snapshot described Latakia and Tartus as fully operational and listed the Europe to Syria sea route as active with an indicative lead time of 3–4 weeks. Because the ports are on the Mediterranean, the closure of the Strait of Hormuz had limited effect on them; the same report noted that neighbours, including Iraq, were looking more to Syrian ports. Cargo from Asia arrives either through the Suez Canal or around Africa with a Mediterranean transshipment, depending on the carrier's routing that month.

OriginUsual way inWatch out for
Northern EuropeContainer via a Mediterranean hub to LatakiaTransshipment adds days; check the hub on the booking
Turkey and the eastern MediterraneanShort sea feeder to Latakia or TartusFeeder schedules change often; confirm weekly
China and East AsiaMain line to a Mediterranean hub, feeder to LatakiaSuez versus Cape routing changes transit by weeks
UAE and GulfContainer from an east-coast UAE port, or road via Jordan insteadHormuz closure moves loading away from Jebel Ali

From the quay to Damascus, Homs and Aleppo

Most containers leave the ports by truck. The newer option is rail: freight trains between Latakia port and the Adra dry port in rural Damascus have resumed after a 14-year suspension, though only a small part of Syria's former 2,800 km network is running and regular service remains a government responsibility. If your consignee is near Damascus, ask whether rail to Adra is available for your box and whether customs clearance can happen there instead of at the port.

Customs at the Syrian ports: papers and the 2026 rules

Syria dropped the separate import licence and import form in 2025. The land and sea ports authority asks for a commercial invoice, a certificate of origin, a bill of lading and an insurance certificate where the cargo is insured, and brokers add a packing list; some goods need ministry approval or laboratory tests. From 1 June 2026 clearance runs under Customs Decree 109 of 2026 and the harmonised tariff in Decree 110. GTAI notes that implementing regulations were not yet published, that fines can now be tied more closely to the value of the goods, and that duty rates may rise or fall by product.

Before a container is booked to Latakia or Tartus

0/7

Sanctions screening still applies at both ports

Country-wide sanctions on Syria are mostly gone. The US rescinded Syria's State Sponsor of Terrorism designation on 24 August 2026, and the EU kept only security-related measures and listings, renewed on 18 May 2026 until 1 June 2027. Named persons remain listed in the US, EU and UK, so every party in a shipment is screened, and goods with US content can still carry US export rules. Golden Way does not run services to Latakia or Tartus; any Syria-related request we receive starts with a compliance review of goods, parties and payment, and we do not help anyone avoid restrictions.

Which port fits your cargo?

A Homs importer has two 40ft containers of consumer goods from Europe. Which port is the usual choice?
Who operates Tartus port in 2026?
Which rules decide the duty on goods cleared in Latakia after 1 June 2026?

Frequently asked questions

Can large container ships call directly at Latakia?

The current terminal is being upgraded so it can take ships drawing up to 16 metres, with a new deeper quay planned. Until that work is finished, much cargo arrives on feeders from Mediterranean hubs.

Who do I deal with at Tartus, the port authority or DP World?

For cargo handling, storage and gate-out, the terminal operator, DP World, under its concession. Customs clearance is still done by Syrian customs through your local agent, and the shipping line's agent issues the delivery order.

Can Iraqi importers use Syrian ports?

The Logistics Cluster noted in May 2026 that access to Syrian ports was becoming more important for neighbouring countries, including Iraq. Border crossings between Syria and Iraq were active at that time; check current conditions before routing.

Can I clear a container at the Adra dry port instead of Latakia?

That depends on whether the box can move under customs control by rail or truck to Adra for your cargo type. Ask your Syrian agent and the carrier before the ship arrives; the bill of lading and manifest have to reflect the plan.

How do I know if my container went to Latakia or Tartus?

The port of discharge is on the bill of lading. Check it on the draft before it is issued; a change after sailing usually costs money and time.

Was this article useful?

Sources

  1. CMA CGM: Group accelerates second phase of Latakia port expansion (20 August 2025)
  2. Enab Baladi: French investment reshapes Syria's transport network (July 2026)
  3. DP World: Tartus port 30-year concession (13 July 2025)
  4. Cyprus Shipping News: DP World commences operations at Tartus port (18 November 2025)
  5. Khaleej Times: DP World fast-tracks $800m Tartous port overhaul (14 May 2026)
  6. Logistics Cluster: Supply Routes Snapshot, Regional Middle East, 25 May 2026
  7. GTAI: Syria customs law and customs tariff 2026 (Decrees 109 and 110)
  8. Enab Baladi: Import without complications in Syria, ambiguity remains (30 July 2025)
  9. US Treasury OFAC: Recent actions, 24 August 2026 (Syria SST rescission)
  10. Council of the EU: Syria restrictive measures renewed until 1 June 2027 (18 May 2026)

General information checked on the date shown. Rules and rates change: our team confirms the details for your shipment.

Keep reading