Get a quote
Shipping basics

Importing EV Chargers into the UAE: Where ECAS Compliance Goes Wrong

An EV charger used for paid charging in a public or commercial place in the UAE needs two MOIAT certificates under ECAS before it is put into use: an electrical safety certificate and a metrological conformity certificate. That is the core of Cabinet Resolution No. 175 of 2025, in force since 27 May 2026. In Dubai the charger must also meet DEWA's technical rules, which ban several connector types common on Chinese chargers.

7 min readUpdated: Golden Way · Dubai · Guangzhou

Key points

  • Cabinet Resolution 175 of 2025 covers AC and DC chargers that sell charging in public or commercial places; home chargers for private use are excluded.
  • The supplier, including the importer, needs an ECAS electrical safety certificate, and the supplier and owning entity need a metrological certificate.
  • Chargers already operating have 365 days from 27 May 2026 to comply.
  • For public charging in Dubai DEWA allows only Type 2 AC and CCS2 DC connectors; GB/T, CHAdeMO, Type 1, CCS1 and NACS are prohibited.
  • Chargers with Wi-Fi, 4G or Bluetooth also need TDRA approval and a TDRA customs permit.

Which chargers Resolution 175 of 2025 catches, and which it does not

The resolution was issued on 18 November 2025 and applies to AC or DC EV supply equipment used in public places or commercial locations to provide paid charging, whether run by a government body, a private company or a licensed operator. It excludes chargers installed by individuals at home for their own use, even if the utility bills the electricity, unless the home unit is used to charge others for a fee.

That split defines two import markets. A distributor bringing DC fast chargers for a mall operator is fully inside the regulation. A retailer selling wallboxes to villa owners is outside Resolution 175, but its products are still low-voltage electrical equipment, and MOIAT's list of regulated products includes both low-voltage products and an entry for EV charging and supply equipment systems. Ask the notified body which scheme your model falls under before you order.

  • Inside Resolution 175 of 2025
  • ECAS electrical safety certificate before public use
  • Metrological conformity certificate and type approval of the metering
  • Annual periodic verification
  • DEWA CPO licence and grid approvals in Dubai
27 May 2026Resolution 175 of 2025 in force
365 daysfor existing chargers to comply
2MOIAT certificates: electrical safety and metrology
OCPP 1.6Jminimum protocol in DEWA's rules

Failure 1: the charger arrives with the wrong connector

This is the most expensive mistake we see in quotes from Chinese factories. Many domestic Chinese chargers are built with GB/T connectors. DEWA's EV Charging Technical Regulations allow only Type 2 for AC and CCS2 for DC on public equipment and say the use of SAE J1772, Type 1, CCS1, NACS, CHAdeMO and GB/T is strictly prohibited. A container of GB/T units cannot be installed in public Dubai locations, however cheap it was.

ConnectorPublic charging in Dubai (DEWA)Notes
Type 2 (AC)AllowedAC Mode 3, up to 22 kVA per charge point
CCS2 (DC)AllowedDC Mode 4, up to 500 kW
GB/TProhibitedCommon on chargers built for the Chinese market
CHAdeMOProhibited
Type 1, CCS1, SAE J1772, NACSProhibitedNorth American and older standards

Prevention: put the connector type, cable length and charging mode (Mode 3 AC, Mode 4 DC) in the purchase order and check them on the pre-shipment sample. If it has already happened: the units can only be reworked by the manufacturer with a compliant connector and then certified, or sold into a market that accepts them.

Failure 2: the unit has a safety certificate but no metrology approval

Resolution 175 treats a public charger as a measuring instrument because people pay by the kilowatt-hour. The meter must meet OIML G 22 requirements, carry the type approval mark and number, and stay within the accuracy class it is approved for. A CB test report for electrical safety, which most Chinese exporters can supply, does not cover this part.

Watch the details that the resolution spells out: the minimum measured quantity is no more than 0.1 kWh for AC and 1.0 kWh for DC, and the equipment must be classed as single-register or bidirectional. Once installed, the charger needs verification every year.

Quick test

A villa owner installs a wallbox for his own car. Does Resolution 175 of 2025 apply?
Which connector is allowed on a public DC charger in Dubai?
Who needs the metrological certificate?

Failure 3: it will not talk to the operator's system or survive the heat

DEWA's technical rules require public chargers to support OCPP 1.6J at least, IP54 and IK10 protection, operation at up to 55°C ambient and 95% relative humidity, a 30 mA type A RCD with auto-recovery, and noise below 60 dB at one metre. AC units are limited to two charge points of up to 22 kVA each, DC units to 500 kW. Meters must be certified to IEC 62052-11 for AC or IEC 62053-41 for DC.

Factories often build a cheaper variant for markets with milder climates and simpler networks. The model name may be the same, but the datasheet is not. Get the datasheet for the exact variant, not the brochure.

Failure 4: the 4G modem triggers TDRA

Networked chargers usually have Wi-Fi, Ethernet, 4G or Bluetooth for the app and the back office. Anything with a radio is telecom equipment in the UAE: the model needs TDRA type approval, and since TDRA's January 2026 reminder, each shipment needs a TDRA customs clearance permit. Missing either can hold the shipment at the port.

Failure 5: certificate scope does not match what was shipped

Certificates are issued for specific models. If the invoice lists "EV charger 60 kW" while the certificate names model ABC-60D-CCS2, customs and inspectors cannot match them. MOIAT ECAS certificates are generally valid for one year and renewable, so a lot shipped after expiry needs a renewed certificate.

Shipping chargers from China to the UAE

Chargers themselves are general cargo unless they contain batteries, so the logistics are simpler than the compliance. DC fast chargers are heavy cabinets that ship on pallets and need forklift or crane unloading at destination; wallboxes ship in cartons and consolidate well. We collect from several factories into one container at our Guangzhou warehouse, check model labels against the certificates before loading, and clear in Dubai. As of November 2026 most UAE cargo is discharged at Khor Fakkan and trucked to Jebel Ali under customs seal.

Duty is normally 5% of the CIF value plus 5% VAT, reverse-charged for VAT-registered importers whose customs code is linked to their tax number.

Before you confirm a charger order

0/9

Frequently asked questions

What does ECAS compliant mean for an EV charger?

It means the charger holds the MOIAT certificates its use requires under the Emirates Conformity Assessment Scheme. For public paid charging that is an electrical safety certificate plus a metrological conformity certificate.

Do the rules differ in Abu Dhabi or Sharjah?

Resolution 175 is federal and applies across the UAE. The connector and grid connection rules quoted here are DEWA's for Dubai; other emirates' utilities set their own connection requirements, so check with the local utility.

Can I import chargers before the certificates are issued?

You can ship, but the goods may be held at customs or cannot be put into public use until they are certified. Storage and demurrage while you wait usually cost more than doing the testing first.

Are portable Mode 2 charging cables covered?

DEWA restricts Mode 1 and Mode 2 cables with extension cords. Portable chargers are low-voltage electrical products, so check the ECAS route with a notified body before importing them for sale.

Who operates public chargers in Dubai?

DEWA's regulation requires a DEWA charge point operator licence, or controlling equity participation by DEWA, to operate public charging equipment.

Was this article useful?

Sources

  1. UAE Cabinet Resolution No. 175 of 2025 on the technical regulation for EV supply equipment (UAE Legislation)
  2. Legal Wires: Cabinet Resolution on EVSE requirements (issue and effective dates)
  3. DEWA: EV Charging Technical Regulations V1
  4. DEWA: EV Charging Infrastructure Regulation V1.3 (Nov 2025)
  5. MOIAT: ECAS regulated products sheet
  6. Gulf News: UAE regulator clarifies rules on telecom imports, customs permits required (Jan 2026)
  7. SGS: UAE MOIAT conformity data sheet

General information checked on the date shown. Rules and rates change: our team confirms the details for your shipment.

Keep reading

Shipping basicsShipping lithium batteries from China: UN numbers, documents and Gulf rules for 2026Ship lithium batteries from China in 2026: the right UN number, UN38.3, SDS, DG declaration, sea vs road vs air rules and the Gulf approvals you will need.8 min readShipping basicsTIR carnet explained: the transit passport for road freightWhat a TIR carnet is, how sealed trucks cross borders without paying duty at each one, which countries use it in 2026, what it costs and the alternatives.9 min readShipping basicsIncoterms 2020 explained: the 11 rules, who pays and where risk passesIncoterms 2020 explained for importers buying from China: all 11 rules, who pays each cost, where risk passes, and the container traps to avoid in 2026.9 min readShipping basicsFOB vs CIF: which is better when you import from China to the Gulf?FOB vs CIF for importers in the UAE and Gulf: who pays freight and destination charges, where risk passes, the CIF insurance gap, and a worked duty example.7 min readShipping basicsEXW vs FOB: the China export clearance problem, and when FOB is saferEXW vs FOB for buyers in China: why EXW leaves you an export clearance you cannot file, how the VAT rebate affects price, and when FOB or FCA is the safer term.7 min readShipping basicsDDP vs DAP: who pays duty and VAT, and which term works for Gulf importsDDP vs DAP explained for Gulf importers: who pays duty and VAT, who is importer of record, why DDP often fails in the UAE and Saudi Arabia, and when to use each.8 min read