Key points
- CMA Terminals runs the Beirut container terminal; customs, the port committee and the line's agent each control a different step
- New container scanners went live in spring 2026 and sit between the quay and the customs yard
- Red-lane containers go to manual inspection; green-lane boxes usually pass without opening
- Customs runs on the Najm system, in use since 1990; when it fails, releases stop across the port
- Hostilities continued in southern Lebanon into October 2026; check war-risk terms with your carrier and insurer
Who does what on the Beirut waterfront
Importers often treat the port as one counterparty. It is at least four, and a release only happens when all of them have signed off. Knowing which desk holds your container saves days of phone calls.
| Party | What it controls | What you need from it |
|---|---|---|
| Shipping line or its Beirut agent | The bill of lading and the cargo manifest | Arrival notice and the delivery order, once freight and local charges are paid |
| CMA Terminals (container terminal operator) | Discharge, yard storage, moves to scanners and inspection areas, gate-out | Terminal invoices settled and a gate appointment for your truck |
| Port management committee (GEPB) | Port dues and the CAMA cargo system that issues port invoices and documents | Port charges paid against your container numbers |
| Lebanese Customs | The declaration, lane assignment, inspection, duty and VAT | Release after the declaration is accepted and paid |
| Your licensed customs agent | Files the declaration and follows the file through customs | A complete, consistent document set before the ship arrives |
CMA CGM won the terminal contract in February 2022 through its subsidiary CMA Terminals and took over operations the following month. The group also fully acquired the container terminal at Tripoli in 2021, which matters if you ever need a second Lebanese port for the north of the country.
Container terminal capacity and the $100m expansion
The terminal is busy. When the foundation stone for a $100m expansion was laid in September 2026, officials described it as close to its existing maximum capacity. The plan enlarges the yard from about 45 to roughly 75 hectares and lifts capacity from about 1.2–1.3 million TEU a year to 3 million, with a new quay, mobile cranes, an automated entry gate and a customs inspection area with scanners. Construction is expected to take 16–18 months, with full operation targeted for 2028.
Until then, expect the yard to be tight when several large vessels arrive together, and expect building works to change truck routes inside the port from time to time. A container that waits for documents occupies space the terminal wants back, so storage charges are where an incomplete file starts to cost money.
Red lane, green lane and the new container scanners
Customs sorts import declarations into two lanes. Goods routed to the red lane are moved from the quay to a designated area and inspected by hand against customs criteria; goods in the green lane often pass without being opened. In June 2025 LBCI reported that the old scanners covered only part of the traffic, roughly 40 of 70 containers a day, and that all exports to Arab countries were already being scanned after smuggling cases.
The replacement scanners sit on the docks and screen containers on arrival, before they reach the customs yard, with images sent live to a customs control room. Each unit can handle up to 100 containers an hour. In April 2026 the public works minister called their activation a key achievement, and the finance minister said a pre-declaration system for imports and a new customs information system were being introduced alongside them.
Najm and CAMA: the two systems behind every release
Two computer systems decide how fast paperwork moves. Najm is the customs system and has been in service since 1990. CAMA, the cargo management system deployed in 2005, links the port, customs, the terminal operator and the shipping lines and produces the invoices and documents needed to process goods. When Najm broke down repeatedly in 2025, clearance slowed at Beirut and other ports and crossings, and the port committee opened a tender to modernise CAMA.
You cannot fix an outage, but you can avoid being the file that was incomplete when the system came back. Agents work through the queue in order, and a declaration that needs a missing certificate goes to the back of it.
Getting a container out of Beirut: the release sequence
- Pre-arrival file to the agentSend the original commercial invoice, packing list, bill of lading, sales contract, proof of payment and any certificate of origin, licence or conformity certificate the goods need, before the vessel berths.
- Arrival notice and delivery orderPay the line's freight balance and local charges to its Beirut agent and collect the delivery order, which proves you may take the goods.
- Declaration lodgedThe agent registers a declaration based on the Single Administrative Document. Companies also need a valid Quietus from the Social Security Office at that moment.
- Scan and laneThe container is scanned at the quay and customs assigns a lane. Red lane means a move to the inspection area and a physical check, often with the agent present.
- Duty, VAT and port chargesCustoms assesses duty and VAT; port dues and terminal charges are paid against the container number.
- Gate-outWith customs release, the delivery order and paid invoices, your trucker collects the container from the terminal and returns the empty to the line's depot within the free time.
Beirut port during the 2026 war
A new war between Israel and Hezbollah began on 2 March 2026. In early March The National reported indirect US assurances that Israel would not strike Beirut's airport or port, described by one diplomat as conditional and narrow, with the port kept running to supply goods. A ceasefire reached on 17 April was renewed in June, but AFP reported on 18 October 2026 that Israeli strikes on southern Lebanon were continuing while talks went on.
For an importer this means three practical things. Carriers may apply war-risk surcharges or change their Beirut calls at short notice, so confirm the routing when you book. Marine insurance should state clearly whether war risks are covered for the voyage and while the box sits in the port. And keep a little more stock than usual, because a security incident can close roads around the port for a day or two even when ships keep calling.
Before your container sails for Beirut
0/8Golden Way does not operate in Lebanon and does not clear goods at Beirut. Where we help is upstream: our Guangzhou team can collect from several Chinese suppliers, check and photograph the cartons and make the invoice and packing list match the load, and our Dubai team handles UAE export and re-export paperwork. Every shipment is screened before we accept it, and we do not help anyone avoid restrictions.
Frequently asked questions
Is Tripoli a realistic alternative to Beirut for containers?
For northern Lebanon it can be. CMA CGM fully acquired the Tripoli container terminal in 2021, and new scanners were installed there after Beirut. Fewer services call, so check which lines serve Tripoli before you route cargo there.
Does the 2020 explosion investigation affect port operations?
Not directly. The government has said redevelopment should proceed separately from the investigation, which remained unresolved in September 2026. The physical rebuilding and safety work does affect layouts and truck routes inside the port.
Who pays storage if customs systems are down?
Normally the importer, because terminal storage and the line's container free time keep running. Ask your agent to record the outage dates; some lines and terminals consider waivers case by case, but there is no automatic right to one.
Can I be present when my container is inspected?
Your customs agent usually attends the physical inspection on your behalf. If the goods are fragile or high value, ask the agent to request careful handling and photographs of the opening and re-packing.
Will the expansion make clearance faster?
The plan includes an automated gate and a customs inspection area with scanners, which should shorten queues. It is due to be fully operational in 2028, so it will not change your 2026 or 2027 shipments much.
Sources
- CMA CGM: Group awarded the Beirut Port container terminal concession (17 February 2022)
- The New Arab: Beirut port launches $100m container terminal expansion (11 September 2026)
- BLOMInvest Bank: Port of Beirut cumulative container activity up 24.34% YoY by April 2026 to 312,646 TEU
- LBCI: Lebanese ministers highlight port scanner rollout and customs modernisation (30 April 2026)
- LBCI: Beirut port overhaul, Lebanon adopts advanced scanning technology (19 June 2025)
- L'Orient Today: Importers call out recurrent IT system failures at Beirut port (2025)
- US Trade.gov: Lebanon import requirements and documentation (Feb 2026)
- The National: US guarantees Israel will not strike Beirut airport (3 March 2026)
- AP via WTOP: What to know about the deal extending the Israel–Lebanon ceasefire (June 2026)
- bdnews24 (AFP): Lebanon to present demands at Tampa talks (18 October 2026)
General information checked on the date shown. Rules and rates change: our team confirms the details for your shipment.